logo

KARNAFULI-MUHURI ENG

Sector: Water Supply and Storage • Location: Bangladesh

Source: World Bank Group

Project
Closed

Purpose of project is to finance the foreign exchange costs of consulting engineering services for the Karnafuli and Muhuri Irrigation Projects in East Pakistan. The Karnafuli Irrigation Project consists of two sub-projects: The Halda sub-project would provide flood protection to an area of 131,500 acres by means of 70 miles of earth embankments of 9-feet average height. Irrigation, with water pum

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government
Location
Bangladesh
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about KARNAFULI-MUHURI ENG

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KARNAFULI-MUHURI ENG” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Purpose of project is to finance the foreign exchange costs of consulting engineering services for the Karnafuli and Muhuri Irrigation Projects in East Pakistan. The Karnafuli Irrigation Project consists of two sub-projects: The Halda sub-project would provide flood protection to an area of 131,500 acres by means of 70 miles of earth embankments of 9-feet average height. Irrigation, with water pumped from the Karnafuli River and utilizing existing natural channels as distributaries, would be provided initially for 55,000 acres. The Muhuri Irrigation Project would provide flood protection to an area of 101,000 acres by means of 92 miles of major embankments of average height 9 feet along the larger streams in the area and 56 miles of smaller embankments along tributary streams. Irrigation drainage and navigation facilities would be similar to those of the Karnafuli project. About 15 percent of the proposed credit would be used for revisions of the feasibility studies for both sub-projects of the Karnafuli project and for the Muhuri project. About 70 percent of the proposed credit would be required for preparation of tender documents and final designs for an initial portion of the major works of the Halda unit of the Karnafuli project and of the Muhuri project.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Bangladesh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project