logo

KARNATAKA POWER II

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Project
Closed

The Second Karnataka Power Project will be implemented by the Karnataka Power Corporation (KPC) and by the Karnataka Electricity Board (KEB). The major features to be implemented by KPC include the construction of the 240MW Sharavathi Tailrace Hydroelectric Scheme (STRS) at Gersoppa and compensatory afforestation associated with STRS as well as the repair of the leaking Talakalale dam upstream of

Project Information FAQ

Project Information

5 Q
The project “KARNATAKA POWER II” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Karnataka Power Project will be implemented by the Karnataka Power Corporation (KPC) and by the Karnataka Electricity Board (KEB). The major features to be implemented by KPC include the construction of the 240MW Sharavathi Tailrace Hydroelectric Scheme (STRS) at Gersoppa and compensatory afforestation associated with STRS as well as the repair of the leaking Talakalale dam upstream of STRS. The main features to be implemented by KEB include the construction of transmission lines and towers, the laying of underground cable and construction of substations. The project will further finance the reinforcement of the primary distribution grid in Banglalore and the implementation of a computerized distribution control centre. Tools and equipment will be purchased and training provided in their use for the construction of transmission and distribution components. Consulting services will be provided for the design and construction of substations and a 400kV double circuit line.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data