logo

Karnataka's Longest Cable-Stayed Bridge Across Sharavathi Backwaters

Sector: Road • Location: Sagar, Karnataka, India

Source: Swarajyamag

Project
Completed

A 2.44 km long cable-stayed bridge spanning the Sharavathi backwaters between Ambargodlu and Kalasavalli on National Highway 369E. It is Karnataka's longest cable-stayed bridge and the second-longest in India. The bridge was constructed to improve connectivity for villages in Sagar and Hosanagara taluks and provide better access to temples such as Sigandur Chowdeshwari and Kollur Mookambike. The p

Project Information FAQ

Project Information

5 Q
The project “Karnataka's Longest Cable-Stayed Bridge Across Sharavathi Backwaters” is an infrastructure initiative in the Road sector, located in Sagar, Karnataka, India. Taiyo aggregates data on it from Swarajyamag.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A 2.44 km long cable-stayed bridge spanning the Sharavathi backwaters between Ambargodlu and Kalasavalli on National Highway 369E. It is Karnataka's longest cable-stayed bridge and the second-longest in India. The bridge was constructed to improve connectivity for villages in Sagar and Hosanagara taluks and provide better access to temples such as Sigandur Chowdeshwari and Kollur Mookambike. The project was approved by the Ministry of Road Transport and Highways in March 2019, commenced in December 2019, and executed by Dilip Buildcon Ltd. The bridge features a 16-metre-wide deck, 11 m carriageway, 1.5 m footpaths on each side, 604 box girder segments, 164 piles of 1.8 m diameter, and 96 cables anchored on four pylons. Approach roads stretch 1 km towards Sagar and 3 km towards Sigandur.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data