Karot Hydropower Project
Sector: Power Generation (CCGT) • Location: Pakistan
Source: 24 News HD
A flagship hydropower project under the China-Pakistan Economic Corridor with a capacity of around 720 MW, built on the Jhelum River. It incorporates advanced engineering techniques including roller-compacted concrete dams and high-efficiency turbines, contributing substantially to Pakistan's national grid with reliable and low-cost electricity.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Hydro, Cement
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- 24 News HD
ConstructChat
Ask ConstructChat about Karot Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A flagship hydropower project under the China-Pakistan Economic Corridor with a capacity of around 720 MW, built on the Jhelum River. It incorporates advanced engineering techniques including roller-compacted concrete dams and high-efficiency turbines, contributing substantially to Pakistan's national grid with reliable and low-cost electricity. |
Original sector | Energy |
Location
Country | Pakistan |
Source
Source | 24 News HD |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Cement |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
