logo

Karratha Airport Solar Plant

Sector: Airport • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Karratha Airport Solar Plant project involves the design, construction, commissioning and operation of a 1 MW solar photovoltaic (PV) facility with cloud predictive technology (CPT) at Western Australia’s second-largest airport Karratha Airport. The City of Karratha, which owns Karratha Airport, will enter into a 21 year power purchase agreement (PPA) with the solar plant. The Karratha Airport

Project Information FAQ

Project Information

5 Q
The project “Karratha Airport Solar Plant” is an infrastructure initiative in the Airport sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Karratha Airport Solar Plant project involves the design, construction, commissioning and operation of a 1 MW solar photovoltaic (PV) facility with cloud predictive technology (CPT) at Western Australia’s second-largest airport Karratha Airport. The City of Karratha, which owns Karratha Airport, will enter into a 21 year power purchase agreement (PPA) with the solar plant. The Karratha Airport Solar Plant project focuses on a stable, long-term energy solution to meet Karratha Airport’s increasing energy demands. Karratha Airport is seeking a cost-effective means of connecting to the North West Interconnected System (NWIS).The NWIS is a smaller network that requires renewable energy systems to adhere to performance criteria to maintain overall network stability. Network owner/operator Horizon Power currently requires high levels of energy storage for solar installations to control output as cloud cover impacts solar generation. This leads to higher costs, making solar less competitive.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data