logo

Kasiya Mining Project

Sector: Warehouse • Location: Malawi

Source: Discovery Alert

Project
In Progress

The Kasiya mining project in Malawi is a large-scale dual-commodity mining development producing rutile and graphite. It features a 2,105 million tonne mineral resource with rutile at 0.96% grade and graphitic carbon at 0.95% grade. The project uses direct excavation of weathered saprolite material, eliminating the need for drilling or blasting, and has a minimum mine life of 25 years. It aims to

Project Information FAQ

Project Information

4 Q
The project “Kasiya Mining Project” is an infrastructure initiative in the Warehouse sector, located in Malawi. Taiyo aggregates data on it from Discovery Alert.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Kasiya mining project in Malawi is a large-scale dual-commodity mining development producing rutile and graphite. It features a 2,105 million tonne mineral resource with rutile at 0.96% grade and graphitic carbon at 0.95% grade. The project uses direct excavation of weathered saprolite material, eliminating the need for drilling or blasting, and has a minimum mine life of 25 years. It aims to produce 222,000 tonnes of rutile and 275,000 tonnes of graphite annually, with a total project revenue of US$16.5 billion over 25 years and an annual EBITDA of US$476 million. The capital requirement is US$727 million. The project has completed its Definitive Feasibility Study as of April 2026, with mining license applications in progress and environmental and social impact assessments underway. Strategic partnerships include technical collaboration with Rio Tinto and alignment with International Finance Corporation Performance Standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data