logo

Katetaula solar home system project

Sector: Energy Storage • Location: Mkushi, Zambia

Source: United Nations Industrial Development Organization (UNIDO)

Project

Katetaula solar home system project involves an establishment of a standalone Solar PV System in Katetaula village located in Mboroma chiefdom in Muswishi Ward of Mukushi South Constituency, Central Province. The residents of this community mainly depend on firewood and charcoal as the main sources of energy for cooking and heating, while solar and other batteries are used for lighting and enterta

Project Information FAQ

Project Information

4 Q
The project “Katetaula solar home system project” is an infrastructure initiative in the Energy Storage sector, located in Mkushi, Zambia. Taiyo aggregates data on it from United Nations Industrial Development Organization (UNIDO).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Katetaula solar home system project involves an establishment of a standalone Solar PV System in Katetaula village located in Mboroma chiefdom in Muswishi Ward of Mukushi South Constituency, Central Province. The residents of this community mainly depend on firewood and charcoal as the main sources of energy for cooking and heating, while solar and other batteries are used for lighting and entertainment. The village is located about 120km from the national grid. With a target of supplying 100 households with SHS and 1 public institution with HDS, the capital cost required was estimated at US$26,500 and the project is open for FDI through majority stake. The project was found to be economically viable at the respective tariffs with ENPV of ZMW27.7 thousand (US$1,538.89) for SHS and K15.34 thousand (US$852.22). Alternatively, REA could develop the sites and engage a private company through a management contract to oversee operations and maintenance of the project site. The project is viable with a capital subsidy of 100% from REA or Cooperating partners. Rural Electrification Act No. 20 of 2003, mandates the Authority to design and offer, on a competitive basis, to developers and/or operators, smart subsidies for capital costs on projects that are designed to supply energy for development of rural areas. The issuance of these subsidies is guided by the Framework for Managing Capital Smart Subsidies in Zambia and The Guidelines for Financing Rural Electrification Projects in Zambia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data