Kathmandu Valley Urban Transportation System Project (Ropeway)
The status, timeline and source of this project. A free account opens every field.
Source: Asian Development Bank (ADB)
ADB has initiated support for sustainable cable car transit in Kathmandu Valley, conducting a pre-feasibility study that identified the Bishnumati river corridor as a suitable route, avoiding UNESCO sites and religious areas. Despite limited local capacity to manage urban and rural transport effectively, the study shows potential for cable-propelled transit to reduce congestion and pollution. Curr
- Status
- Prospective
- Sector
- Road, Energy Storage, Bridge, Mass Transit, Hotel, Cable car, Residential, Commercial, Government, Automotive
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Kathmandu Valley Urban Transportation System Project (Ropeway)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ADB has initiated support for sustainable cable car transit in Kathmandu Valley, conducting a pre-feasibility study that identified the Bishnumati river corridor as a suitable route, avoiding UNESCO sites and religious areas. Despite limited local capacity to manage urban and rural transport effectively, the study shows potential for cable-propelled transit to reduce congestion and pollution. Current private sector cable car projects in Nepal mainly cater to tourism, while the need for accessible, affordable public transport solutions remains unmet. To bridge this gap, ADB's TA will include a detailed feasibility study for the Bishnumati corridor and pre-feasibility analysis for two rural routes, assessing demand, economic viability, propulsion systems, and freight options. The project will integrate advanced clean energy components, including renewable energy integration, electric propulsion systems, regenerative braking, digital twins for energy efficiency, battery storage feasibility, and Finite Element Analysis (FEA) for optimizing energy and structural efficiency. The project will support capacity building for cable propelled transit (CPT) systems, focusing on integrating clean energy technologies through training, workshops, and institutional strengthening to enhance operational and technical expertise. It will also aim to create a robust, sustainable public transport framework by integrating policy development, organizational support, regulatory standards, and resilience measures. |
Original sector | Transport |
Budget |
Location
Country | Nepal |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Road, Energy Storage, Bridge, Mass Transit, Hotel, Cable car, Residential, Commercial, Government, Automotive |
Article published date | 2025-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Nepal
- Himal Power Limited
- Kathmandu-Kulekhani-Hetauda Tunnel Highway
- Subregional Transport Facilitation (NEP)
- Upgrades to Gokuleswor-Thaktholi road
- Kathmandu-Terai Fast Track expressway project
- Nepal-India Electricity Transmission and Trade Project
- Upgrades to Chinchu (Pokhare)-Devisthal-Jajarkot road
- Hulaki highway
