logo
ProjectProposed

Kathmandu Valley Urban Transportation System Project (Ropeway)

The status, timeline and source of this project. A free account opens every field.

Source: Asian Development Bank (ADB)

ADB has initiated support for sustainable cable car transit in Kathmandu Valley, conducting a pre-feasibility study that identified the Bishnumati river corridor as a suitable route, avoiding UNESCO sites and religious areas. Despite limited local capacity to manage urban and rural transport effectively, the study shows potential for cable-propelled transit to reduce congestion and pollution. Curr

Status
Prospective
Sector
Road, Energy Storage, Bridge, Mass Transit, Hotel, Cable car, Residential, Commercial, Government, Automotive
Location
Nepal
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Kathmandu Valley Urban Transportation System Project (Ropeway)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kathmandu Valley Urban Transportation System Project (Ropeway)” is an infrastructure initiative in the Road sector, located in Nepal. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ADB has initiated support for sustainable cable car transit in Kathmandu Valley, conducting a pre-feasibility study that identified the Bishnumati river corridor as a suitable route, avoiding UNESCO sites and religious areas. Despite limited local capacity to manage urban and rural transport effectively, the study shows potential for cable-propelled transit to reduce congestion and pollution. Current private sector cable car projects in Nepal mainly cater to tourism, while the need for accessible, affordable public transport solutions remains unmet. To bridge this gap, ADB's TA will include a detailed feasibility study for the Bishnumati corridor and pre-feasibility analysis for two rural routes, assessing demand, economic viability, propulsion systems, and freight options. The project will integrate advanced clean energy components, including renewable energy integration, electric propulsion systems, regenerative braking, digital twins for energy efficiency, battery storage feasibility, and Finite Element Analysis (FEA) for optimizing energy and structural efficiency. The project will support capacity building for cable propelled transit (CPT) systems, focusing on integrating clean energy technologies through training, workshops, and institutional strengthening to enhance operational and technical expertise. It will also aim to create a robust, sustainable public transport framework by integrating policy development, organizational support, regulatory standards, and resilience measures.

Original sector

Transport

Budget

Location

Country

Nepal

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Road, Energy Storage, Bridge, Mass Transit, Hotel, Cable car, Residential, Commercial, Government, Automotive

Article published date

2025-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project