Kathmandu Valley Water Distribution, Sewerage, and Urban Development

Sector: Road • Location: Nepal

Source: Asian Development Bank (ADB)

Project
Closed

Given the increasing urban population, basic urban services needs is also increasing at the rapid pace in the Kathmandu Valley. Considering this rapid urbanization, it is essential that the urban areas in Nepal prepare a long term strategy and investment/financing plan to meet the required urban basic services needs including water supply, wastewater management, urban transport, and solid waste ma

Project Information FAQ

Project Information

5 Q
The project “Kathmandu Valley Water Distribution, Sewerage, and Urban Development” is an infrastructure initiative in the Road sector, located in Nepal. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Given the increasing urban population, basic urban services needs is also increasing at the rapid pace in the Kathmandu Valley. Considering this rapid urbanization, it is essential that the urban areas in Nepal prepare a long term strategy and investment/financing plan to meet the required urban basic services needs including water supply, wastewater management, urban transport, and solid waste management services. Under the ongoing ADB's Melamchi Water Supply Project (MWSP) and Kathmandu Valley Water Services Sector Development Program (KVWSSDP), water supply and wastewater management services in the Kathmandu Valley are being improved. In particular, the KVWSSDP supports institutional reforms in the water supply and sanitation (WSS) sector in the Kathmandu Valley by establishing the Water Utility Operator (WUO) which will be managed by a competitively selected private sector form through a performance based management contract. The major water source augmentation works for the Kathmandu Valley which aim to divert water from the Melamchi Valley are being undertaken under the MWSP. However, since the capital costs for the water source augmentation is substantial, the water distribution networks and the wastewater management works are to be taken up in the phases. Finally, solid waste management is becoming a serous problem in the Kathmandu Valley as the municipalities could not find a long-term solution for solid waste disposal, resorting to use of several temporary sites in the face of the residents' protests against nearby disposal sites. The primary objective of the proposed PPTA is to prepare a loan project to improve the basic urban services in the Kathmandu Valley including water supply, wastewater management, solid waste management, drainage and urban transport, backed by a long-term urban strategy and, in the WSS sector, a capital investment and asset management plan (CIAMP) for the WUO. Particular emphasis will be put on the coordination among parties carrying out various urban infrastructure development activities and/or providing various urban services, regarding excavation, construction safety, environmental impact mitigation, traffic management/temporary detouring, and road resurfacing. The TA outputs consist of (i) a project preparation report for the ensuing loan, including design and monitoring framework, components, implementation arrangements, cost estimates and financing plan, and comprehensive feasibility studies in conformity with ADB requirements; (ii) an implementation manual for a smooth and efficient execution of the DNI works, including (a) a traffic, environmental and safety management strategy such as temporary detouring arrangements during excavation and (b) an effective coordination mechanism with operators of other underground utilities, municipal public works departments and local police; (iii) initial 5-year rolling CIAMP for the WUO; and (iv) an urban sector review and long-term urban development strategy based on growth scenarios assessment in the Kathmandu Valley and other emerging urban areas in Nepal.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data