Renewable Energy Investments of South Africa (Pty) Ltd was created to build, own and operate renewable energy facilities, such as the 81 MW Kathu solar PV project to be located in Kathu, northern Cape, South Africa. The developer was a south African based investment vehicle aimed specifically at RE investments. Lokian Trading & Investments (Pty) Limited was reported as the official bidder. The pr

Project Information FAQ

Project Information

5 Q
The project “Kathu Solar Plant” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Renewable Energy Investments of South Africa (Pty) Ltd was created to build, own and operate renewable energy facilities, such as the 81 MW Kathu solar PV project to be located in Kathu, northern Cape, South Africa. The developer was a south African based investment vehicle aimed specifically at RE investments. Lokian Trading & Investments (Pty) Limited was reported as the official bidder. The project was expected to generate 193 GWh annually. Italian renewable energy developer Building Energy was reported by the CDM document as the developer behind the project, but no further reports could be identified. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012. The tender was open to all technologies, 53 bids were submitted of which 28 made it to preferred bidder status. These 28 project account for a total of 1,416MW if all are implemented. The EIA was passed (as was required for all bidders). Under bid rules, the project had to have at least 35% local content. There would be a 20 year PPA with the state owned utility, Eskom. The developer expected that the project may be expanded in phases of 150MW to a total of 600MW. Construction was expected to start in July 2012. EIA was completed in September 2011, executed by Savannah Environmental (Pty) Ltd (SE). Total project cost was estimated at ZAR 2.4 Billion (USD 250 million), with commissioning expected in early 2014. The project applied for UNFCCC CDM financing. O&M costs were estimated at 0.24 million ZAR/kWh. Project IRR before tax, without CERs was estimated at -3.4%. The project reached financial close in November 2012. The total project cost was USD 396 million. Equity injected totaled 112 million, including a 42 million sub-debt portion. RMB Bank provided significant financing http://cdm.unfccc.int/filestorage/4/Z/I/4ZIPGJQDUREC3FXWM7B1NA0K6OTVL9/PDD%20Kathu.pdf?t=OXZ8bTNleXJofDCqs58EKslievKIGA6adK9e

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data