Katoski Drive Bridge Replacement
Sector: Water Supply and Storage • Location: Waterloo, Iowa, United States of America
Source: Dodge USA
This project involves the replacement of the existing 14' x 20' steel beam bridge with a new twin 12' x 7' precast concrete box culvert, including paving and grading.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Steel, Government, Bridge, Commercial, Waste Processing and Treatment, Road, Metal
- Location
- Waterloo, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Katoski Drive Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the replacement of the existing 14' x 20' steel beam bridge with a new twin 12' x 7' precast concrete box culvert, including paving and grading. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Waterloo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Government, Bridge, Commercial, Waste Processing and Treatment, Road, Metal |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
