Katowice Heat Supply & Conservation Project
Sector: Water Supply and Storage • Location: Poland
Source: World Bank Group
The objectives of the Katowice Heat Supply and Conservation Project are to: 1) enhance energy conservation and efficiency in the district heating sector; 2) extend the life of existing district heating assets through rehabilitation and introduction of modern technologies, thereby significantly reducing capital expenditures and operating and maintenance costs; and 3) reduce environmental pollution
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Katowice Heat Supply & Conservation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Katowice Heat Supply and Conservation Project are to: 1) enhance energy conservation and efficiency in the district heating sector; 2) extend the life of existing district heating assets through rehabilitation and introduction of modern technologies, thereby significantly reducing capital expenditures and operating and maintenance costs; and 3) reduce environmental pollution through investments in energy-efficient equipment and systems as well as by supporting a program to eliminate coal-fired heat-only boilers. The project will support implementation of the Government's ongoing energy sector restructuring program and it comprises: 1) an investment component consisting of investments in equipment to optimize the existing district heating system; and 2) technical assistance through consultancy services, studies and staff training. The project scope can be summarized as follows: a) reduction of water losses; b) improvement of water quality; c) reduction of heat losses; d) introduction of automation, controls and metering at the substation level; e) improvement of network monitoring; f) conversion of system control from fixed to variable flow; g) enhancement of system load dispatching capability; h) elimination of small heat-only boilers; i) a consumer installations pilot program; and j) technical assistance and training. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Poland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
