logo

Kattupalli Shipyard

Sector: Manufacturing (Industrial) • Location: India

Source: Larsen & Toubro

Project
Completed

Kattupalli, completely conceptualized, developed and designed in house, accommodates three major facilities: shipbuilding, port (recently sold to the Adanis) and a modular fabrication facility. One of the largest shipyards in Asia, Kattupalli is the only one with a ship lift, has an annual production capacity of 4,65,000 tons and one of the major international destinations for ship repair in the S

Project Information FAQ

Project Information

4 Q
The project “Kattupalli Shipyard” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in India. Taiyo aggregates data on it from Larsen & Toubro.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Kattupalli, completely conceptualized, developed and designed in house, accommodates three major facilities: shipbuilding, port (recently sold to the Adanis) and a modular fabrication facility. One of the largest shipyards in Asia, Kattupalli is the only one with a ship lift, has an annual production capacity of 4,65,000 tons and one of the major international destinations for ship repair in the South East Asian region. Executed under tough marine conditions, at a remote location (35 km from Chennai), it involved the transportation of over 2.9 million tons of rock from quarries located over 100 km away across inferior roads. A standout feature is the breakwater; a portion of the core was designed and constructed with dredged sand by optimizing the rock quarrying requirement and speeding up construction. The wave walls for the breakwater were redesigned as precast PCC wave wall to accelerate breakwater construction to compensate the time loss due to cyclone impacts. We have also built two kms Approach Trestles in the Sea.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data