Kavarna Wind Farm

Sector: Wind • Location: Bulgaria

Source: World Bank Group

Project
Active

In December 2008, EVN Enertrag Kavarna OOE, a joint venture between EVN [Austria] (70%) and wind specialists Enertrag [Germany] (30%) announced that they had taken over and would complete a wind project planned by Universum Energy [Bulgaria], close to Bulgarevo village in the northeast Bulgarian municipality of Kaliakra. EVN Enertrag Kavarna was to develop the project in two stages. The first, 50M

Project Information FAQ

Project Information

4 Q
The project “Kavarna Wind Farm” is an infrastructure initiative in the Wind sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2008, EVN Enertrag Kavarna OOE, a joint venture between EVN [Austria] (70%) and wind specialists Enertrag [Germany] (30%) announced that they had taken over and would complete a wind project planned by Universum Energy [Bulgaria], close to Bulgarevo village in the northeast Bulgarian municipality of Kaliakra. EVN Enertrag Kavarna was to develop the project in two stages. The first, 50MW, stage to be completed and connected to the grid at a cost of around EUR95 million (US$132.05 million) involved 25, 2-MW Vestas V90 turbines, with average annual production of 140 GWh. A 30 MW second stage is planned for a future date. In June 2009, it was reported that all necessary permits had been acquired and that construction was advancing. There were no reports on how the project was financed; therefore the construction start date was used as a proxy for the financial closure date. The right to construct the wind farm was won by Universum Energy in two tenders held by the local municipality in early 2004, while the project received approval from the Varna Regional Inspectorate for Environment and Waters (RIOSV Varna) in July 2005. Implementation was delayed by environmental groups' appeals against the RIOSV Varna decision at various levels of the local judicial system, with their final appeal rejected in 2008. The wind farm was due to enter commercial operation in the second quarter of 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data