Kawarau Falls Bridge Replacement, Queenstown, New Zealand

Sector: Airport • Location: New Zealand

Source: Road Traffic Technology

Project
Closed

The new bridge is expected to be approximately 250m-long and 14m-wide. Credit: NZ Transport Agency. Kawarau Falls Bridge Replacement works began in December 2015. Credit: NZ Transport Agency. The new bridge has two traffic lanes. Credit: McConnell Dowell. Construction of a new replacement bridge on New Zealand’s State Highway 6 (SH6) over the Kawarau River at Frankton in Kawarau Falls began in Dec

Project Information FAQ

Project Information

5 Q
The project “Kawarau Falls Bridge Replacement, Queenstown, New Zealand” is an infrastructure initiative in the Airport sector, located in New Zealand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new bridge is expected to be approximately 250m-long and 14m-wide. Credit: NZ Transport Agency. Kawarau Falls Bridge Replacement works began in December 2015. Credit: NZ Transport Agency. The new bridge has two traffic lanes. Credit: McConnell Dowell. Construction of a new replacement bridge on New Zealand’s State Highway 6 (SH6) over the Kawarau River at Frankton in Kawarau Falls began in December 2015. The new two-lane bridge replaces the old single-lane bridge in the ever-increasing traffic at Frankton Flats commercial development area. The project is managed by New Zealand Transport Agency (NZTA). More than 7,000 vehicles pass through the existing Kawarau Falls Bridge each day. The newbridge provides safer and secure southern highway access into the Wakatipu Basin without any traffic congestion. It was opened to traffic in May 2018. Constructed in 1924, the existing Kawarau Falls Bridge serves two-way traffic on a single lane. The bridge requires increasing maintenance to meet the rise in traffic volumes in the Frankton Flats area. Its scoping report in 2001 proposed eight new options for the construction of a new river bridge at Kawarau Falls. The scheme assessment report (SAR) for the same was prepared in 2003 that considered four options after public consultations. The SAR was commissioned in 2005 to review and confirm the preferred option for the new bridge construction. As part of the review, the commission took full geotechnical investigation into the river and its banks into consideration. It also further analysed and involved the affected parties in consultation. A public open day was held in Frankton before the preparation of a notice of requirement and resource consents for the new bridge construction in December 2011. Following the public hearing, Queenstown Lakes District Council appointed Commissioners in February 2013. Otago Regional Council gave the necessary consents to build the new bridge. Funding for the project was announced in June 2014 by theNew ZealandGovernment under the regional road package. Three bids were received by the end of June 2015 for the construction of the new bridge. McConnell Dowell Constructors was selected as a design-build contractor for construction. The new bridge is built just downstream from the existing bridge with a modified northern approach from Frankton. The southern approach is tied in with the present highway that runs along the river bank. Constructed in a curve with a 163m radius, the new 250m-long, 14m-wide bridge is designed to withstand a once in 2,500 years earthquake. It includes two full traffic lanes with a wide-sealed road shoulder to safely accommodate cyclists and a footpath on one side. The design places four steel beams spanning between single-column piers located 45m apart. It also includes a slim superstructure and guardrails installation, which maximises the view of the river for the bridge users. The old bridge continues to remain in place and become part of the Queenstown Trail cycling and walking network, which increases safety for visitors and locals enjoying the Lake Wakatipu environment. The new bridge addresses pressing short to medium-term traffic growth issues in the Frankton Flats area. It accommodates the growing traffic volumes resulting from growth and commercial development in Frankton Flats, around Queenstown International Airport. It eliminates delays at the existing one-lane bridge and improves the State Highway link from Queenstown to Southland and Milford Sound. It also provides safer and more efficient connections to Queenstown International Airport, Frankton Flats and the Queenstown central business district (CBD). McConnell Dowell Constructors was awarded a NZ$22m ($16.1m) design-build contract for the replacement bridge in September 2015. It worked in collaboration with Novare Design, the bridge design engineers. McConnell Dowell Constructors also worked in association with other contractors including Coffey International, Boffa Miskell and Hadley Consultants, Arup NZ, Holmes Consulting, Allied Concrete and MWH for bridge construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data