Kayenta Pumped Storage Hydropower Project
The status, timeline and source of this project. A free account opens every field.
Source: The Arizona Republic
A proposed hydropower project on Navajo Nation land that would draw water from the Coconino Aquifer using 10 wells to generate electricity. The project is smaller than the previously proposed Black Mesa project and is currently seeking community and regulatory approval.
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Power Generation (CCGT)
- Location
- Kayenta, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- The Arizona Republic
ConstructChat
Ask ConstructChat about Kayenta Pumped Storage Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed hydropower project on Navajo Nation land that would draw water from the Coconino Aquifer using 10 wells to generate electricity. The project is smaller than the previously proposed Black Mesa project and is currently seeking community and regulatory approval. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Arizona |
City | Kayenta |
Source
Source | The Arizona Republic |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
