The objective of the Moinak Electricity Transmission Project for Kazakhstan is to increase and improve the supply of electricity to business enterprises and households in southern Kazakhstan in an economically and environmentally sustainable manner. There are three components to the project. The first component of the project is construction of transmission lines. It consists of the following sub-

Project Information FAQ

Project Information

5 Q
The project “Kazakhstan Moinak Electricity Transmission Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Moinak Electricity Transmission Project for Kazakhstan is to increase and improve the supply of electricity to business enterprises and households in southern Kazakhstan in an economically and environmentally sustainable manner. There are three components to the project. The first component of the project is construction of transmission lines. It consists of the following sub-components: A) construction of Overhead Transmission Line (OHTL) from Moinak Hydroelectric Power Plant (MHPP) to Shelek Substation (SS): this involves the construction of about 97 km long 220 kV single circuit OHTL; and B) construction of OHTL from MHPP to Robot SS: this involves the construction of about 225 km long 220 kV single-circuit OHTL. The second of the project is modernization of SS. It consists of the following sub-components: A) construction of 220/110 kV Outdoor Switchyard (OSY) at MHPP: the works include the construction with a configuration consisting of double main busbars and transfer bus and installation of circuit breakers, disconnect switches, current and voltage transformers, and lightning over voltage and relay protection systems; B) modernization of 220 kV Robot SS: the works include the reconstruction of the existing 220 kV switching topology and installation of circuit breakers, disconnectors, current and voltage transformers, and lightning over voltage and relay protection systems; and C) modernization of 220 kV Shelek SS: the works include the reconstruction of the existing 220 kV switching topology and installation of circuit breakers, disconnectors, current and voltage transformers, and lightning over voltage and relay protection systems. The third component of the project is consulting and technical services. It consists of the following components: A) procurement and project management: this comprises consulting services for procurement and project management, including: the preparation o f bidding documents, assistance in bid evaluation and implementation supervision; and B) technical services: these include support for selection of the transmission routes, conduct of engineering surveys and engineering supervision of the turn-key contracts during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data