logo

Kazakhstan: Reconstruction of M-32 Highway Aktobe-Karabutak-Ulgaisyn Section Project

Sector: Water Supply and Storage • Location: Kazakhstan

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

The Project entails reconstruction and upgrade (from two- to four-lanes) a 234 kilometers (km) road section of the M-32 Highway, starting from the city of Aktobe, through Karabutak to Ulgaysyn in the Aktobe region of Kazakhstan. The subject road section runs through the western part of Kazakhstan and forms a key segment of the Western Europe-Western China transport corridor. It is one of the larg

Project Information FAQ

Project Information

5 Q
The project “Kazakhstan: Reconstruction of M-32 Highway Aktobe-Karabutak-Ulgaisyn Section Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Kazakhstan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project entails reconstruction and upgrade (from two- to four-lanes) a 234 kilometers (km) road section of the M-32 Highway, starting from the city of Aktobe, through Karabutak to Ulgaysyn in the Aktobe region of Kazakhstan. The subject road section runs through the western part of Kazakhstan and forms a key segment of the Western Europe-Western China transport corridor. It is one of the largest transportations routes traversing through Kazakhstan, linking the East with the West. The Project will focus on improving the road conditions and implementing road safety measures and climate resilient standards. The Project will also support the toll system of the road to enhance its self-sustainability. It is among the pioneers in using an integrated Design Build and Maintain (DBM) contract model using an Output Performance- Based Road Contract (OPBRC) format. This integrated contract model allows mobilizing private sector expertise to develop project design and long-term maintenance program up-front to suit specific project features, therefore facilitating a lifecycle approach to road infrastructure planning. It will also reduce the risk of cost overruns and implementation delays faced in the conventional input-based contract model. The total Project cost is estimated at USD1,124 million. The Project will be co-financed by AIIB and the European Bank for Reconstruction and Development (EBRD). Each Bank is expected to provide its sovereign backed loan of USD502 million respectively. The remaining USD120 million of total project cost, including taxes, will be covered by counterpart funding. The Project comprises two components: Component 1. Resilient and Safe Road Connectivity Component 2. Capacity Building and Implementation Support

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data