logo
ProjectProposed

Kazakhstan: Strategic Road Connectivity and Sector Modernization Project

The status, timeline and source of this project. A free account opens every field.

Source: Asian Infrastructure Investment Bank (AIIB)

The Project aims to upgrade a selected section of the Middle Corridor between Jezkazgan and Karagandy, focusing on improving road conditions and implementing climate-resilient standards. It will pioneer the use of integrated design, build, and maintenance contracts through the Output and Performance-Based Road Contracts (OPBRC) format to optimize value for money and encourage private sector partic

Status
Prospective
Sector
Government, Electric Vehicles (EVs), Residential, Road, Power Generation (CCGT), Commercial, Power Transmission, Automotive
Location
Kazakhstan
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Kazakhstan: Strategic Road Connectivity and Sector Modernization Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kazakhstan: Strategic Road Connectivity and Sector Modernization Project” is an infrastructure initiative in the Government sector, located in Kazakhstan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project aims to upgrade a selected section of the Middle Corridor between Jezkazgan and Karagandy, focusing on improving road conditions and implementing climate-resilient standards. It will pioneer the use of integrated design, build, and maintenance contracts through the Output and Performance-Based Road Contracts (OPBRC) format to optimize value for money and encourage private sector participation. Additionally, the Project will enhance last mile connectivity with rural areas along the road corridor, improve road sustainability and safety measures, review national road design standards with a focus on climate resilience and road safety, and provide institutional capacity building support. The estimated total Project cost is USD1.53 billion and will be co-financed by the World Bank Group (WB) and AIIB. Both financiers plan to contribute USD650 million each. The remaining 15 percent of the Project cost will be covered by counterpart funding. The Project comprises three components: Component 1. Resilient and Safe Road Connectivity. This component accounts for 99 percent of the total Project cost. It involves (i) reconstruction and upgrading of an existing 498km third category highway between Jezkazgan - Karagandy to a first category dual-carriageway highway, following national road classification standards with the improved climate resilient and road safety measures. It will pioneer the use of integrated design, build and maintenance contracts; (ii) improvement of around 40km all-weather Last Mile Connectivity roads to the rural areas along the corridor; and (iii) implementation of road sustainability and road safety features, including electronic tolling facilities, rapid electric charging stations, and axle load management systems and road safety audit. Component 2. Transport System Development. It includes (i) review of national road design standards to incorporate climate resilience and road safety measures; and (ii) identify actions to improve the sustainability and efficiency in supporting the middle corridor development. Component 3. Project Management and Implementation Support. This component includes experts to assist "KazAvtoZhol" NC" JSC (the Implementation Entity, QAJ) in designing and implementing the performance-based contracts for the Project.

Original sector

Transport

Procurement method

Budget

Location

Country

Kazakhstan

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Government, Electric Vehicles (EVs), Residential, Road, Power Generation (CCGT), Commercial, Power Transmission, Automotive

Article published date

2024-10-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project