KAZREF II - Borey Wind
Cancelled · Kazakhstan
Source: European Bank for Reconstruction and Development (EBRD)
The provision of a senior loan of up to KZT 19.3 billion (equivalent to US$ 44.83 million) to Borey Energo LLP to finance the development, construction, and operation of a wind power plant in central Kazakhstan, with a total installed capacity of 100 MW, as well as construction of a double-circuit 110kV line to connect to the 220kV Shygys substation.
- Status
- Closed
- Sector
- Power Generation (CCGT), Wind, Commercial, Residential
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about KAZREF II - Borey Wind
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The provision of a senior loan of up to KZT 19.3 billion (equivalent to US$ 44.83 million) to Borey Energo LLP to finance the development, construction, and operation of a wind power plant in central Kazakhstan, with a total installed capacity of 100 MW, as well as construction of a double-circuit 110kV line to connect to the 220kV Shygys substation. |
Original sector | Energy |
Budget |
Location
Country | Kazakhstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
