Kearns 4015 West Bridge Replacement Phase 1
Sector: Water Supply and Storage • Location: Salt Lake City, Utah, United States of America
Source: Dodge
The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. Items of work are as follows: 1. Construct a box culvert for the canal across 4015 West including bridge removal, box culvert construction with associated headwalls, wing walls, fencing, grading, and canal liner. 2. Reconstruct and repr
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Commercial, Automotive, Bridge, Government, Road, Waste Processing and Treatment
- Location
- Salt Lake City, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Kearns 4015 West Bridge Replacement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. Items of work are as follows: 1. Construct a box culvert for the canal across 4015 West including bridge removal, box culvert construction with associated headwalls, wing walls, fencing, grading, and canal liner. 2. Reconstruct and reprofile 4015 West over the new canal box culvert. Reconstruct the intersection of 4015 West and 471... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Salt Lake City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Automotive, Bridge, Government, Road, Waste Processing and Treatment |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
