logo
ProjectClosed

Keaton Avenue Drainage

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

The project includes: Base bid construction of (A) a storm water system under Keaton Avenue (within the right-of-way (ROW) or easements) to capture flow from the channel upstream of the Keaton Ave. crossing and convey it underground to be released downstream of Shepherd Lane (approximately 950 ) (B) widening the existing channel south of Shepherd Lane to Wynnwood Drive to approximately 17-feet wid

Status
Closed
Sector
Water Supply and Storage, Commercial, Road, Manufacturing (Industrial), Raw Materials, Waste Processing and Treatment, Government
Location
Tyler, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Keaton Avenue Drainage

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Keaton Avenue Drainage” is an infrastructure initiative in the Water Supply and Storage sector, located in Tyler, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes: Base bid construction of (A) a storm water system under Keaton Avenue (within the right-of-way (ROW) or easements) to capture flow from the channel upstream of the Keaton Ave. crossing and convey it underground to be released downstream of Shepherd Lane (approximately 950 ) (B) widening the existing channel south of Shepherd Lane to Wynnwood Drive to approximately 17-feet wide by 5-feet deep to provide additional capacity and protection from potential erosion (approximat...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Tyler

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Road, Manufacturing (Industrial), Raw Materials, Waste Processing and Treatment, Government

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project