logo

Keene Road Pathway Phase 4 Improvements

Sector: Hydro • Location: West Richland, Washington, United States of America

Source: Dodge USA

Project
Closed

The project provides for the improvements of approximately 1.3 miles of 12-foot-wide asphalt pavement pathway along Keene Rd. between Belmont Blvd. and W. Van Giesen St (SR224). The work shall include project temporary traffic control, construction surveying, removing asphalt concrete pavement, roadway excavation incl. haul, 1226 CY of crushed surfacing top course, 1030 tons of Commercial HMA, soi

Status
Closed
Sector
Hydro, Government, Cement, Commercial, Road, Water Supply and Storage
Location
West Richland, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Keene Road Pathway Phase 4 Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Keene Road Pathway Phase 4 Improvements” is an infrastructure initiative in the Hydro sector, located in West Richland, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project provides for the improvements of approximately 1.3 miles of 12-foot-wide asphalt pavement pathway along Keene Rd. between Belmont Blvd. and W. Van Giesen St (SR224). The work shall include project temporary traffic control, construction surveying, removing asphalt concrete pavement, roadway excavation incl. haul, 1226 CY of crushed surfacing top course, 1030 tons of Commercial HMA, soil residual herbicide, roadside ditches, shoulder restoration, structural earth walls, check dams ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

West Richland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Government, Cement, Commercial, Road, Water Supply and Storage

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project