Keene Road Pathway Phase 4 Improvements
Sector: Water Supply and Storage • Location: West Richland, Washington, United States of America
Source: Dodge USA
The project provides for the improvements of approximately 1.3 miles of 12-foot-wide asphalt pavement pathway along Keene Rd. between Belmont Blvd. and W. Van Giesen St (SR224). The work shall include project temporary traffic control, construction surveying, removing asphalt concrete pavement, roadway excavation incl. haul, 1226 CY of crushed surfacing top course, 1030 tons of Commercial HMA, soi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project provides for the improvements of approximately 1.3 miles of 12-foot-wide asphalt pavement pathway along Keene Rd. between Belmont Blvd. and W. Van Giesen St (SR224). The work shall include project temporary traffic control, construction surveying, removing asphalt concrete pavement, roadway excavation incl. haul, 1226 CY of crushed surfacing top course, 1030 tons of Commercial HMA, soil residual herbicide, roadside ditches, shoulder restoration, structural earth walls, check dams ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
