Keepit Dam Safety Upgrades, New South Wales
Sector: Car parking • Location: Thailand
Source: Water Technology
Package 1 of the Keepit dam safety upgrade project was completed in November 2011. Image courtesy of State Water Corporation. The safety upgrade project is funded by the NSW Government. Image courtesy of State Water Corporation. Keepit Dam creates Lake Keepit which has a catchment area of 570,000ha. Image courtesy of Casliber. Keepit Dam located on the Namoi River in New South Wales (NSW) is bein
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Package 1 of the Keepit dam safety upgrade project was completed in November 2011. Image courtesy of State Water Corporation. The safety upgrade project is funded by the NSW Government. Image courtesy of State Water Corporation. Keepit Dam creates Lake Keepit which has a catchment area of 570,000ha. Image courtesy of Casliber. Keepit Dam located on the Namoi River in New South Wales (NSW) is being upgraded to comply with safety standards. The project is a major component of the seven dam upgrades funded by the NSW Government and managed by State Water throughout regional NSW. The upgrade project will protect the communities of Gunnedah, Narrabri, Wee-Waa and Walgett from extreme floods and enable the dam to withstand earthquakes. The storage capacity and water releases from the dam will however remain constant. Keepit Dam upgrade is being implemented under two contract packages. The first contract package worth $40m was started in March 2010 and completed in November 2011. Construction of the second phase is expected to commence in 2014 and complete by 2016. The upgrades to the seven dams are expected to generate quarter of a billion dollars into regional economies. The total investment on the project is expected to reach $146.4m. Keepit Dam is a major gated dam comprising of a spillway with six radial gates. It is a mass concrete gravity dam with an earth fill abutment and a central gated concrete overflow crest. It provides flood mitigation, hydro-power, irrigation, water supply and conservation. Its construction commenced in 1939 and was completed in 1960. The dam has a crest length of 533m, is 55m high and covers a surface area of 4,730ha. It impounds Namoi River and creates Lake Keepit with its catchment area covering 5,700km2. The storage capacity of the dam is 425,510 mega litres and the power generation capacity is 6MW. The first contract package for the project comprised of constructing two auxiliary fuse plug spillways, a main saddle dam, two access roads and two smaller saddle dams. The new main saddle dam is 185m long and 7m high. The project necessitated the construction of two concrete batch plants and a large refrigeration unit to provide the batch plant with cool water. Modifications were also made to the Lake Keepit Recreation Park by constructing a new amenities building, relocating the caravan sites and providing ancillary facilities. Project activities under the second contract package will primarily involve the raising of the dam by 3.4m, raising the embankment dam with a parapet wall, increasing flood and seismic loading by installing post-tensioned anchors, modifying the spillway gates, upgrading the electrical appliances and modifying the gantry crane. It will also involve the construction of two new fishways downstream at Mollee and Gunidgera and removal of the Weeta weir to provide fish passage. Certain upgrades will be made to the Split Rock Dam to withstand extreme flooding. The electrical works will be carried out prior to the main construction works under the second phase of the project. The project will also witness the construction of a multi-level offtake structure at the main dam wall to improve the quality of water downstream. John Holland constructed the main saddle dam and the two spillways, while the two access roads and auxiliary saddle dams were constructed by Soil Conservation Service (SCS). MPC Earthmoving assisted in constructing the bund walls, carried out the general earthworks and supplied six excavators. Mackellar Excavations provided three dump trucks, two excavators, two graders and four semi-trailers for the project. Hamcon Civil was contracted to remove the two cofferdams, constructed as part of the first contract package, from the site. The detailed design work for the second phase is being carried out by SMEC. The US Army Corps of Engineers (USACE) completed foundation remediation works for the Wolf Creek Dam in March 2013. Delta Works is a massive chain of flood protection structures that were constructed after the occurrence of the North Sea flood of 1953. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
