logo
ProjectClosed

Keesler AFB Construct Troop Walk

Sector: Car parking • Location: Keesler Air Force Base, Mississippi, United States of America

Source: Dodge

he work performed under this contract will consist of furnishing all labor, materials, and equipment necessary to construct a new concrete troop walk at Keesler AFB, MS as specified in the Statement of Work, Specifications, and as shown in the drawings. This acquisition will be conducted as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, utilizing Lowest Price Technically Accep

Status
Closed
Sector
Car parking, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government
Location
Keesler Air Force Base, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Keesler AFB Construct Troop Walk

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Keesler AFB Construct Troop Walk” is an infrastructure initiative in the Car parking sector, located in Keesler Air Force Base, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

he work performed under this contract will consist of furnishing all labor, materials, and equipment necessary to construct a new concrete troop walk at Keesler AFB, MS as specified in the Statement of Work, Specifications, and as shown in the drawings. This acquisition will be conducted as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, utilizing Lowest Price Technically Acceptable (LPTA) Procedures. Interested SDVOSB sources may submit a proposal. The North American Indu...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Keesler Air Force Base

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Car parking, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project