Kegley Road Improvements Phase III & IV
Sector: Commercial • Location: Temple, Texas, United States of America
Source: Dodge USA
Reconstruction of Kegley Road from Blue Star to Charter Oak including grading, select fill, crushed limestone base, asphalt paving, drainage infrastructure, bridges, water utilities, wastewater utilities, sidewalks, signage and striping, erosion control and re-vegetation.
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Bridge, Car parking, Consumer Products, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Temple, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kegley Road Improvements Phase III & IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruction of Kegley Road from Blue Star to Charter Oak including grading, select fill, crushed limestone base, asphalt paving, drainage infrastructure, bridges, water utilities, wastewater utilities, sidewalks, signage and striping, erosion control and re-vegetation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Temple |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Bridge, Car parking, Consumer Products, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
