KEGOC: Ekibastuz-YukGres power transmission
Sector: Steel • Location: Kazakhstan
Source: European Bank for Reconstruction and Development (EBRD)
The proposed project consists of a 2nd and 3rd section: 1) 2nd section 475 km 500 kV OHTL “1150 kV Ekibastuzskaya SS - 500 kV Agadyr SS”, with extension of 500 kV Outdoor Switchgear at 1150 kV Ekibastuzskaya SS and 500 kV Outdoor Switchgear at Agadyr SS; 2) 3rd section 390 km 500 kV OHTL “500 kV Agadyr SS - 500 kV YuKGRES SS”, with extension to connections to 500 kV Outdoor Switchgear at 500
- Status
- Closed
- Sector
- Steel, Raw Materials, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government, Metal
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about KEGOC: Ekibastuz-YukGres power transmission
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of a 2nd and 3rd section: 1) 2nd section 475 km 500 kV OHTL “1150 kV Ekibastuzskaya SS - 500 kV Agadyr SS”, with extension of 500 kV Outdoor Switchgear at 1150 kV Ekibastuzskaya SS and 500 kV Outdoor Switchgear at Agadyr SS; 2) 3rd section 390 km 500 kV OHTL “500 kV Agadyr SS - 500 kV YuKGRES SS”, with extension to connections to 500 kV Outdoor Switchgear at 500 kV Agadyr SS and to 500 kV Outdoor Switchgear at 500 kV YuKGRES SS. The Bank's funding will primarily be used for civil works, steel towers, overhead transmission line conductors and other equipment between YukGRES and Agadyr substations. The objectives of the proposed project are to address energy and peak supply deficits in South Kazakhstan, improve electricity transmission reliability, reduce transmission losses and contribute to development of regional electricity trade in Central Asia. The proposed project will promote competition and trade both on national and regional levels in allowing low cost producers in North Kazakhstan to supply South Kazakhstan and the Central Asia integrated system, and to meet winter electricity supply shortages in South Kazakhstan. The project will contribute to the integration of the regional economy. In addition, the project will seek to achieve improvements in the existing transmission tariff methodology to reflect best international practice. Kazakhstan Electricity Grid Operating Company (KEGOC), the 100%-State-ownednatural monopoly high-voltage long distance electricity transmission company. A non-sovereign, secured, senior loan of USD 87.8 million to be partially syndicated to commercial banks. Approx. USD 245.7 million. Screening categories and rationale for classification The operation and construction of such high voltage power transmission lines have specific environmental, health and safety impacts which, however, can be readily identified and prevented through adequate measures and application of good international practice. The project follows an existing transmission line corridor and will not be associated with either new routing nor will it traverse environmentally sensitive or populated areas. For the above reasons, the EBRD has classified the project B/1, requiring an Environmental Analysis and Environmental Audit. An independent consultant was engaged to prepare an Environmental Audit and Analysis of the project, and confirmed no significant environmental issues. Key Environmental issues and mitigation This public sector project involves construction of a new power transmission line. Because the line will follow an existing corridor, the environmental impacts associated with air emissions, physical alteration and the impact on sensitive natural habitats, archaeological sites, and agricultural and commercial areas are expected to be limited. Some impact may arise from disposal of construction waste; there is also the issue of occupational safety during construction. However, these construction related issues can be dealt with by applying appropriate working practises, thus keeping any negative impact to a minimum. The consultant summarized the key environmental aspects of the project as follows: Necessary Action KEGOC will be required to adhere to Kazakh environmental, health and safety regulations and design the project in line with EU environmental standards. In line with national requirements an Environmental Impact Assessment will be undertaken as part of the design approval process. This will also include public consultations as required under National legislation. No separate Environmental Action Plan is required. Disclosure of information and consultation In the context of the EBRD’s participation in the project, KEGOC released locally a summary of relevant environmental issues associated with the project both in Kazak and Russian language. Monitoring and reporting The Company will monitor the environmental impact of its operations in accordance with the law and regulations of Kazakhstan. The Bank will evaluate the project's compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports prepared for the project covering: The Bank’s representatives will also conduct periodic site supervision visits when deemed appropriate. None. |
Original sector | Energy |
Location
Country | Kazakhstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Steel, Raw Materials, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government, Metal |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project