KEGOC Integration of the West Zone
Sector: Road • Location: Kazakhstan
Source: European Bank for Reconstruction and Development (EBRD)
Senior unsecured loan of up to EUR 297 million equivalent to be disbursed in KZT, USD and/or EUR to KEGOC. The loan proceeds will be used to finance integration of the West electric power system zone (“West Zone”) with the Unified Power System (the “UPS”) of Kazakhstan (the “Project”), to deliver a resilient and efficient energy system, while accelerating the decarbonization of the energy sector,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | signed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Senior unsecured loan of up to EUR 297 million equivalent to be disbursed in KZT, USD and/or EUR to KEGOC. The loan proceeds will be used to finance integration of the West electric power system zone (“West Zone”) with the Unified Power System (the “UPS”) of Kazakhstan (the “Project”), to deliver a resilient and efficient energy system, while accelerating the decarbonization of the energy sector, accounting for 80 per cent of the country’s carbon emissions. The proceeds of the Bank's investment will be used as follows: The proposed infrastructure will connect totally isolated West Zone with the Unified Power System of Kazakhstan with a new 670 km line, significantly enhancing the system's flexibility by allowing inter-regional electricity transfer, supporting the system security and accelerating the decarbonisation of energy sector. Implementation of the Project will also enable connection of the recently announced c.12GW renewable energy sources and up to 1.5-1.8GW/3.0-3.6GWh battery storage fleet to be installed by 2030, ensuring secure and uninterrupted clean electricity supply. The existing aged and isolated grid poses significant challenges to electricity supply decarbonisation and effective renewables integration. Achieving carbon neutrality is impossible without ensuring a reliable and uninterrupted supply of essential clean energy services to both the population and businesses. Networks and storage represent 32% of all global net-zero investments. The Project is expected to result in significant environmental benefits through increased efficiency of the national grid operation, associated reduction of transmission losses, and CO2 emissions. Download Zip file in English Download Zip file in Russian Download Zip file in Kazak Full ESIA documentation is available locally at: 1) EBRD Resident Office in Astana, 16 Dostyk Street, Talan Towers offices BC, 23rd floor, Astana City, Kazakhstan, +7 7172 554250; 2) EBRD Resident Office in Almaty, 41 Kazybek Bi Street, Park Palace Business Centre, 3rd entrance, 3rd floor, Almaty City, Kazakhstan, +7 (7273) 320000; and Client website Environmental or social enquiries Ibraeva Arnika or Medetbekova Alma Kazakhstan Electricity Grid Operating Company Kazakhstan, Astana, Almaty district, 59 Tauelsizdik Ave, Z00T2D0 Tel. + 7 (7172) 69-38-24 +7 (7172) 69-05-68 e-mail: kegoc@kegoc.kz |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
