logo
ProjectSigned

KEGOC Integration of the West Zone

Sector: Road • Location: Kazakhstan

Source: European Bank for Reconstruction and Development (EBRD)

Senior unsecured loan of up to EUR 297 million equivalent to be disbursed in KZT, USD and/or EUR to KEGOC.  The loan proceeds will be used to finance integration of the West electric power system zone (“West Zone”) with the Unified Power System (the “UPS”) of Kazakhstan (the “Project”), to deliver a resilient and efficient energy system, while accelerating the decarbonization of the energy sector,

Status
Under Construction
Sector
Road, Water Supply and Storage, Energy Storage, Residential, Power Transmission, Power Generation (CCGT), Commercial, Government
Location
Kazakhstan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about KEGOC Integration of the West Zone

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “KEGOC Integration of the West Zone” is an infrastructure initiative in the Road sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Senior unsecured loan of up to EUR 297 million equivalent to be disbursed in KZT, USD and/or EUR to KEGOC.  The loan proceeds will be used to finance integration of the West electric power system zone (“West Zone”) with the Unified Power System (the “UPS”) of Kazakhstan (the “Project”), to deliver a resilient and efficient energy system, while accelerating the decarbonization of the energy sector, accounting for 80 per cent of the country’s carbon emissions. The proceeds of the Bank's investment will be used as follows: The proposed infrastructure will connect totally isolated West Zone with the Unified Power System of Kazakhstan with a new 670 km line, significantly enhancing the system's flexibility by allowing inter-regional electricity transfer, supporting the system security and accelerating the decarbonisation of energy sector. Implementation of the Project will also enable connection of the recently announced c.12GW renewable energy sources and up to 1.5-1.8GW/3.0-3.6GWh battery storage fleet to be installed by 2030, ensuring secure and uninterrupted clean electricity supply. The existing aged and isolated grid poses significant challenges to electricity supply decarbonisation and effective renewables integration. Achieving carbon neutrality is impossible without ensuring a reliable and uninterrupted supply of essential clean energy services to both the population and businesses. Networks and storage represent 32% of all global net-zero investments. The Project is expected to result in significant environmental benefits through increased efficiency of the national grid operation, associated reduction of transmission losses, and CO2 emissions. Download Zip file in English Download Zip file in Russian Download Zip file in Kazak Full ESIA documentation is available locally at: 1) EBRD Resident Office in Astana, 16 Dostyk Street, Talan Towers offices BC, 23rd floor, Astana City, Kazakhstan, +7 7172 554250; 2) EBRD Resident Office in Almaty, 41 Kazybek Bi Street, Park Palace Business Centre, 3rd entrance, 3rd floor, Almaty City, Kazakhstan, +7 (7273) 320000; and Client website Environmental or social enquiries Ibraeva Arnika or Medetbekova Alma Kazakhstan Electricity Grid Operating Company Kazakhstan, Astana, Almaty district, 59 Tauelsizdik Ave, Z00T2D0 Tel. + 7 (7172) 69-38-24 +7 (7172) 69-05-68 e-mail: kegoc@kegoc.kz

Original sector

Energy

Budget

Location

Country

Kazakhstan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Energy Storage, Residential, Power Transmission, Power Generation (CCGT), Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project