Keliber Lithium Project
Sector: Oil and Gas • Location: Finland
Source: Sharewise
Sibanye-Stillwater’s Keliber lithium project is expected to produce Europe’s first battery-grade lithium hydroxide from its own ore. The project includes several mining areas, a concentrator in Päiväneva, Kaustinen area, and a lithium hydroxide refinery in the Kokkola Industrial Park, with production expected to start in the first half of 2026.
- Status
- Closed
- Sector
- Oil and Gas, Manufacturing (Industrial), Energy Storage
- Location
- Finland
- Updated
- 22 Jul 2026
- Source
- Sharewise
ConstructChat
Ask ConstructChat about Keliber Lithium Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sibanye-Stillwater’s Keliber lithium project is expected to produce Europe’s first battery-grade lithium hydroxide from its own ore. The project includes several mining areas, a concentrator in Päiväneva, Kaustinen area, and a lithium hydroxide refinery in the Kokkola Industrial Park, with production expected to start in the first half of 2026. |
Original sector | Mining |
Budget |
Location
Country | Finland |
Source
Source | Sharewise |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Manufacturing (Industrial), Energy Storage |
Article published date | 2025-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
