Keller Peak Tower Replacement
Closed · California · Last reported Oct 2024
Source: Dodge USA
Project comprises labor, material and services necessary for: Major components of Project Work consist of the construction of a new replacement self-supporting 80 communication tower with 20 mast and 8 lightning rod (108 total), foundation, and feed line bridge. Demolition will include removal of existing footings, wooden poles, and foundation from the fallen tower. The tower, microwave, and anten
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Bridge
- Location
- West Sacramento, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Keller Peak Tower Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project comprises labor, material and services necessary for: Major components of Project Work consist of the construction of a new replacement self-supporting 80 communication tower with 20 mast and 8 lightning rod (108 total), foundation, and feed line bridge. Demolition will include removal of existing footings, wooden poles, and foundation from the fallen tower. The tower, microwave, and antenna brackets will meet CBC Title 24 Standards and the requirements related to the Essential Servic... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | West Sacramento |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Bridge |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
