Keller Peak Tower Replacement
Sector: Bridge • Location: West Sacramento, California, United States of America
Source: Dodge USA
Project comprises labor, material and services necessary for: Major components of Project Work consist of the construction of a new replacement self-supporting 80 communication tower with 20 mast and 8 lightning rod (108 total), foundation, and feed line bridge. Demolition will include removal of existing footings, wooden poles, and foundation from the fallen tower. The tower, microwave, and anten
- Status
- Prospective
- Sector
- Bridge, Manufacturing (Industrial), Commercial
- Location
- West Sacramento, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Keller Peak Tower Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project comprises labor, material and services necessary for: Major components of Project Work consist of the construction of a new replacement self-supporting 80 communication tower with 20 mast and 8 lightning rod (108 total), foundation, and feed line bridge. Demolition will include removal of existing footings, wooden poles, and foundation from the fallen tower. The tower, microwave, and antenna brackets will meet CBC Title 24 Standards and the requirements related to the Essential Servic... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | West Sacramento |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
