Kelly Pit Sand and Gravel Extraction
Sector: Raw Materials • Location: Simcoe, Ontario, Canada
Source: Simcoe Reformer
A new sand and gravel pit project on a 29-hectare property located at 364 St. John's Road East in Simcoe. The property has been rezoned from agricultural to extractive industrial to operate the new pit, which has an estimated 2.7 million tons of aggregate primarily sand to be extracted over the life of the site. The pit will be licensed to extract up to 325,000 tonnes of aggregate per year, with t
- Status
- Prospective
- Sector
- Raw Materials, Manufacturing (Industrial), Road
- Location
- Simcoe, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Simcoe Reformer
ConstructChat
Ask ConstructChat about Kelly Pit Sand and Gravel Extraction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A new sand and gravel pit project on a 29-hectare property located at 364 St. John's Road East in Simcoe. The property has been rezoned from agricultural to extractive industrial to operate the new pit, which has an estimated 2.7 million tons of aggregate primarily sand to be extracted over the life of the site. The pit will be licensed to extract up to 325,000 tonnes of aggregate per year, with the exact amount market-driven. |
Original sector | Built Sector |
Location
Country | Canada |
State | Ontario |
City | Simcoe |
Source
Source | Simcoe Reformer |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Manufacturing (Industrial), Road |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
