logo

Kelly’s Brook Shared Use Path

Sector: Road • Location: Newfoundland and Labrador, Canada

Source: Infrastructure Canada

Project
Completed

The construction of Kelly’s Brook Shared-Use Path consists of upgrading and connecting the existing walking trail from Kings Bridge Road to Columbus Drive to create a continuous 5.2 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and es

Project Information FAQ

Project Information

3 Q
The project “Kelly’s Brook Shared Use Path” is an infrastructure initiative in the Road sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The construction of Kelly’s Brook Shared-Use Path consists of upgrading and connecting the existing walking trail from Kings Bridge Road to Columbus Drive to create a continuous 5.2 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and essential destinations with a shared-use path that will attract people of all ages and abilities to walk, stroll, roll or cycle. The route alignment was refined through public engagement and detailed design has already been completed. Some sections of existing trail will be relocated to avoid steep grades and tight turns, ensuring accessibility along the entire corridor. The existing trail will be widened to 3.0 metres. Some sections of the route will be installed along street corridors. The scope of the construction work includes clearing and grubbing, removing existing trail surface, removing and replacing fencing, fill and grading, installing a new trail surface, and reinstating the trail edge. The project includes the construction of rest areas, trailheads, signage and wayfinding. It includes landscaping and may include lighting along the path. Existing access paths from nearby streets will be upgraded, and additional access paths may be created. Street crossings and intersections will be upgraded to create a continuous and comfortable route.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data