Kelly’s Brook Shared Use Path
Sector: Road • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The construction of Kelly’s Brook Shared-Use Path consists of upgrading and connecting the existing walking trail from Kings Bridge Road to Columbus Drive to create a continuous 5.2 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and es
- Status
- Under Construction
- Sector
- Road, Bridge, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Kelly’s Brook Shared Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of Kelly’s Brook Shared-Use Path consists of upgrading and connecting the existing walking trail from Kings Bridge Road to Columbus Drive to create a continuous 5.2 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and essential destinations with a shared-use path that will attract people of all ages and abilities to walk, stroll, roll or cycle. The route alignment was refined through public engagement and detailed design has already been completed. Some sections of existing trail will be relocated to avoid steep grades and tight turns, ensuring accessibility along the entire corridor. The existing trail will be widened to 3.0 metres. Some sections of the route will be installed along street corridors. The scope of the construction work includes clearing and grubbing, removing existing trail surface, removing and replacing fencing, fill and grading, installing a new trail surface, and reinstating the trail edge. The project includes the construction of rest areas, trailheads, signage and wayfinding. It includes landscaping and may include lighting along the path. Existing access paths from nearby streets will be upgraded, and additional access paths may be created. Street crossings and intersections will be upgraded to create a continuous and comfortable route. |
Original sector | Active Transportation |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-07-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
