logo

Kelo Irrigation Project

Sector: Cement • Location: Raigarh, Chhattisgarh, India

Source: India Investment Grid (IIG)

Project
Closed

Information Water Resources-CT has come up with Kelo Irrigation Project with a ticket size of 727.04 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion.

Project Information FAQ

Project Information

5 Q
The project “Kelo Irrigation Project” is an infrastructure initiative in the Cement sector, located in Raigarh, Chhattisgarh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Water Resources-CT has come up with Kelo Irrigation Project with a ticket size of 727.04 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. Kelo Irrigation Project of Chhattisgarh envisages construction of an earthen dam with masonry/concrete spillway across river Kelo, a tributary of river Mahanadi. The project is situated near village Danote, 8 km north of Raigarh town in Raigarh district of Chhattisgarh. The Project envisages construction of earthen dam with two saddle dams and a concrete spillway as detailed below - i. Earthen dam of maximum height of 24.22 m with total length of 2.27 km comprising of main earthen dam of 1.27 km, saddle I earthen dam of 90 m and saddle II earthen dam of 910m. ii. Masonry/concrete gravity dam is provided in saddle I comprising of 142 m overflow portion and 50 m non over flow portion with 8 no gates having size 14.25mX10.0m. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 240.327 crore Eligible Central Assistance was Rs 51.495 crore CA released since 2016 till June 2023 - 42.4278 crore State Share released through NABARD under LTIF till June 2023- Rs Nil Physical progress- 91 percentage Financial Progress- 95 percentage Ultimate Irrigation Potential is 22810 Ha Irrigation Potential created till June 2023- 17583 Ha Projected Date of Completion- December 2023

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data