logo

Kelowna - H2O Adventure and Fitness Centre Energy Modernization

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Pre-Construction

The proposed project at the existing Kelowna H2O Adventure & Fitness Centre will upgrade the building’s heat recovery, HVAC equipment, and lighting, and install approximately 100 kW of solar photovoltaics and approximately 10 Level-2 electric vehicle charging ports. The project will reduce the building’s greenhouse gas emissions by an estimated 70% by reducing natural gas use, generating clean ene

Status
Prospective
Sector
Solar, Natural Gas, Seaport, Electric Vehicles (EVs), Automotive
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Kelowna - H2O Adventure and Fitness Centre Energy Modernization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Kelowna - H2O Adventure and Fitness Centre Energy Modernization” is an infrastructure initiative in the Solar sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project at the existing Kelowna H2O Adventure & Fitness Centre will upgrade the building’s heat recovery, HVAC equipment, and lighting, and install approximately 100 kW of solar photovoltaics and approximately 10 Level-2 electric vehicle charging ports. The project will reduce the building’s greenhouse gas emissions by an estimated 70% by reducing natural gas use, generating clean energy, and improving public access to clean energy transportation. The facility continues to be owned by the City of Kelowna and operated by YMCA Okanagan, as has been the case since the facility opened in 2009. The project works will include: - LED lighting; - heat recovery system upgrades; - air-source and dual-source heat pumps to replace select heating and cooling equipment; - variable-frequency drives on pool pumps; - ventilation controls; - solar photovoltaic array with approximately 100 kW capacity; - approximately 10 Level-2 electric vehicle charging stations; - electrical system upgrades for future EV charging expansion; and - mechanical, electrical, control/monitoring, signage, and other related works and appurtenances.

Original sector

Green Energy

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Solar, Natural Gas, Seaport, Electric Vehicles (EVs), Automotive

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project