logo
ProjectUnder Construction

Kelso 1 & 2 Solar Project

The owner, status and timeline of this project. A free account opens every field.

Source: KRCU

The Kelso 1 and 2 solar farms, developed by Arevon Energy, are major utility-scale solar projects in Scott County that aim to provide power for over 66,000 homes. The project will span approximately 2,500 acres and is set to be completed in two phases by early 2026.

Status
Under Construction
Sector
Power Transmission, Power Generation (CCGT), Solar
Location
Missouri, United States of America
Updated
22 Jul 2026
Source
KRCU

ConstructChat

Ask ConstructChat about Kelso 1 & 2 Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kelso 1 & 2 Solar Project” is an infrastructure initiative in the Power Transmission sector, located in Missouri, United States. Taiyo aggregates data on it from KRCU.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kelso 1 and 2 solar farms, developed by Arevon Energy, are major utility-scale solar projects in Scott County that aim to provide power for over 66,000 homes. The project will span approximately 2,500 acres and is set to be completed in two phases by early 2026.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Missouri

Source

Source

KRCU

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Solar

Article published date

2025-05-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project