Kelso Solar Project
The owner, status and timeline of this project. A free account opens every field.
Source: Renewables Now
Arevon Energy Inc has started construction on its 430-MWdc Kelso 1 & 2 solar project in Missouri, marking its first utility-scale renewable energy development in the state. The project is expected to begin commercial operations by the end of 2025 for the first phase, with the second phase targeted for early 2026.
- Status
- Under Construction
- Sector
- Solar, Commercial, Power Generation (CCGT), Power Transmission
- Location
- Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Renewables Now
ConstructChat
Ask ConstructChat about Kelso Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Arevon Energy Inc has started construction on its 430-MWdc Kelso 1 & 2 solar project in Missouri, marking its first utility-scale renewable energy development in the state. The project is expected to begin commercial operations by the end of 2025 for the first phase, with the second phase targeted for early 2026. |
Original sector | Solar Power |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Renewables Now |
URL |
More Details
Record type | Project |
Sector | Solar, Commercial, Power Generation (CCGT), Power Transmission |
Article published date | 2025-05-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in USA
- This old house: Rethinking the retrofit
- Hortech Corporate Campus
- Luther College Carbon Neutrality Initiative
- Solar and Battery Systems for West Arlington Apartments
- Pad-Mounted Transformers Supply Contract
- San Diego Natural History Museum Roof Replacement and Upgrades
- Crimson Orchard Project
- Sunraycer Solar-Storage Projects
