Kelwa Amet Road ODR 12
Sector: Road • Location: India
Source: World Bank Group
In April 2005,Public Works Department (PWD), Government of Rajasthan signed a 7 year concession contract (including 9 month of construction period) to India’s A.K. Duggar & Company to strengthen the 18 km section on Other District Road 12 (ODR 12) between Kelwa and Amet in the state of Rajasthan.
Under the contract, A.K. Duggar & Company was responsible for the rehabilitation, finance, operation
- Status
- Prospective
- Sector
- Road, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kelwa Amet Road ODR 12
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 2005,Public Works Department (PWD), Government of Rajasthan signed a 7 year concession contract (including 9 month of construction period) to India’s A.K. Duggar & Company to strengthen the 18 km section on Other District Road 12 (ODR 12) between Kelwa and Amet in the state of Rajasthan. Under the contract, A.K. Duggar & Company was responsible for the rehabilitation, finance, operation and maintenance of the existing two-lane highway with paved side shoulders. The project was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. A.K. Duggar & Company won the tender through competitive bidding, conducted by PWD, Rajasthan, by requesting the lowest concession period of 7 years. The SPV was to recover the capital costs and operating costs including returns through tolls during the concession period (excluding construction period). The concession agreement for the project was signed in April 2005. The total capital cost of the project was estimated at US$ 1.5 million. Construction on the project began in April 2005 and was expected to be completed by December 2005. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited