Kemaman Port East Wharf Privatization
Sector: Water Supply and Storage • Location: Malaysia
Source: World Bank Group
In September 2006, Konsortium Pelabuhan Kemaman Sdn Bhd (KPK) won a 60-year contract to expand and manage the East Wharf and Liquid Chemical Berth at Kemaman Port, Pahang State, Malaysia. The cost of the entire project was not disclosed, however, a new liquid chemical berth was estimated to cost RM45 million (US$12.3 million), while there was a separate cost for the acquisition of movable assets a
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Chemical (Industrial), Seaport, Government, Manufacturing (Industrial)
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kemaman Port East Wharf Privatization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2006, Konsortium Pelabuhan Kemaman Sdn Bhd (KPK) won a 60-year contract to expand and manage the East Wharf and Liquid Chemical Berth at Kemaman Port, Pahang State, Malaysia. The cost of the entire project was not disclosed, however, a new liquid chemical berth was estimated to cost RM45 million (US$12.3 million), while there was a separate cost for the acquisition of movable assets at the port. KPK was jointly owned by two Malaysian firms, Road Builder (M) Holdings and the Eastern Pacific Industrial Corporation Bhd (EPIC). Road Builder was subsequently bought fully by Malaysian firm IJM Corporation. EPIC held 61-percent of KPK, while the remainder was held by IJM Corporation, through its wholly-owned subsidiary, Road Builders (M) Holdings. KPK acquired the movable assets of the port form RM1.2 million ($327,000) and signed a separate lease agreement for the East Wharf and Liquid Chemical Berth. KPK held an initial 30-year lease that was renewable for another 30 years. The total capacity of the project was not released. KPK assumed operational responsibility for the port on 1 October, 2006. As of June 2007, the project was operational. |
Original sector | Transport |
Budget |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Chemical (Industrial), Seaport, Government, Manufacturing (Industrial) |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
