Kemaman Port East Wharf Privatization
Sector: Road • Location: Malaysia
Source: World Bank Group
In September 2006, Konsortium Pelabuhan Kemaman Sdn Bhd (KPK) won a 60-year contract to expand and manage the East Wharf and Liquid Chemical Berth at Kemaman Port, Pahang State, Malaysia. The cost of the entire project was not disclosed, however, a new liquid chemical berth was estimated to cost RM45 million (US$12.3 million), while there was a separate cost for the acquisition of movable assets a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In September 2006, Konsortium Pelabuhan Kemaman Sdn Bhd (KPK) won a 60-year contract to expand and manage the East Wharf and Liquid Chemical Berth at Kemaman Port, Pahang State, Malaysia. The cost of the entire project was not disclosed, however, a new liquid chemical berth was estimated to cost RM45 million (US$12.3 million), while there was a separate cost for the acquisition of movable assets at the port. KPK was jointly owned by two Malaysian firms, Road Builder (M) Holdings and the Eastern Pacific Industrial Corporation Bhd (EPIC). Road Builder was subsequently bought fully by Malaysian firm IJM Corporation. EPIC held 61-percent of KPK, while the remainder was held by IJM Corporation, through its wholly-owned subsidiary, Road Builders (M) Holdings. KPK acquired the movable assets of the port form RM1.2 million ($327,000) and signed a separate lease agreement for the East Wharf and Liquid Chemical Berth. KPK held an initial 30-year lease that was renewable for another 30 years. The total capacity of the project was not released. KPK assumed operational responsibility for the port on 1 October, 2006. As of June 2007, the project was operational. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
