Kemin Balykchy Interconnection
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
A sovereign loan to the Kyrgyz Republic, to be on-lent to the Joint-Stock Company National Electric Grid of Kyrgyz Republic (“NEGK”) to finance the construction of an approximate 53 km 500 kV overhead transmission line (OHTL) in Kyrgyz Republic between the existing Kemin substation (SS) in Chui region and a new substation named “Balykchy, SS”, 6.4 km outside Balykchy city in the Issyk-Kul region (
- Status
- Under Construction
- Sector
- Commercial, Nuclear, Power Transmission, Road, Energy Storage, Power Generation (CCGT), Residential, Government
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Kemin Balykchy Interconnection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A sovereign loan to the Kyrgyz Republic, to be on-lent to the Joint-Stock Company National Electric Grid of Kyrgyz Republic (“NEGK”) to finance the construction of an approximate 53 km 500 kV overhead transmission line (OHTL) in Kyrgyz Republic between the existing Kemin substation (SS) in Chui region and a new substation named “Balykchy, SS”, 6.4 km outside Balykchy city in the Issyk-Kul region (“Project”). NEGK is the transmission and distribution systems operator, that owns and operates more than 10,000 km of power transmission lines of 110 kV and higher, as well as 190 substations with primary voltages of 500, 220 or 110 kV. NEGK is 98.63% owned by the state (65.3% by Ministry of Energy of Kyrgyz Republic and 33.33% by the Ministry of Finance of Kyrgyz Republic). The remaining 1.37% shares are owned by minority shareholders. The primary objective of the Project is to support evacuation of c.1 GW renewable energy power plants under development to the national power grid. Implementing the Project will also significantly improve the transmission networks’ reliability, efficiency, stability, quality and security of the electricity supply. The expected transition impact of the project is through the Green quality. Download zip file of package Full ESIA documentation is available locally at: OJSC “National Electric Grid of Kyrgyzstan”326 Zhibek Zholu avenue, Bishkek, Kyrgyz Republic, 720070 Department of External Relations and Project Implementation Email: 1piunegk@gmail.com Phone: +996 312 67 03 19 And EBRD Bishkek Resident Office Business Centre Orion, 21 Erkindik Boulevard, 4th Floor, 720040 Bishkek, Kyrgyz Republic Phone: +996 312 624 016 Environmental or social enquiries Mr Bekboo Niyazov Department of External Relations and Project Implementation Email: 1piunegk@gmail.com Phone: +996 312 67 03 19 |
Original sector | Energy |
Budget |
Location
Country | Kyrgyzstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Commercial, Nuclear, Power Transmission, Road, Energy Storage, Power Generation (CCGT), Residential, Government |
Article published date | 2026-01-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project