Kennedy Ave. Lift Station 14 Replacement
Sector: Water Supply and Storage • Location: Schererville, Indiana, United States of America
Source: Dodge
Included in the scope of work is furnishing and installing a new concrete wet well and valve vault, bypass structure, piping and valves in the new wet well and valve vault, buried 8-inch force main, installation of control panel, engine-generator, and pump equipment listed in Appendices I and II, furnishing and installing new junction box and power wiring, from control panel into wet well, concret
- Status
- Prospective
- Sector
- Water Supply and Storage, Natural Gas, Cement, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government
- Location
- Schererville, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Kennedy Ave. Lift Station 14 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Included in the scope of work is furnishing and installing a new concrete wet well and valve vault, bypass structure, piping and valves in the new wet well and valve vault, buried 8-inch force main, installation of control panel, engine-generator, and pump equipment listed in Appendices I and II, furnishing and installing new junction box and power wiring, from control panel into wet well, concrete duct bank below site roadway, site fencing and gate, site lighting, natural gas connection and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Schererville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Natural Gas, Cement, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
