Kennedy High School Modernization
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
SF +/- Scope: Phase 1.2/Increment (1)- Site Preparation (DSA Approval Set) Select Demolition (exc demo package from phase 1.1 which is by others). Relocation and installation of underground utilities including electrical, low-voltage, domestic water, fire water, irrigation water, sanitary sewer, and storm drain. Earthwork and grading. Phase 1.3/Increment (2)- Construction of Building A (classrooms
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Power Generation (CCGT), Waste Processing and Treatment, Residential, Commercial, Power Transmission, Steel, Consumer Products, Education, Government
- Location
- Richmond, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Kennedy High School Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SF +/- Scope: Phase 1.2/Increment (1)- Site Preparation (DSA Approval Set) Select Demolition (exc demo package from phase 1.1 which is by others). Relocation and installation of underground utilities including electrical, low-voltage, domestic water, fire water, irrigation water, sanitary sewer, and storm drain. Earthwork and grading. Phase 1.3/Increment (2)- Construction of Building A (classrooms) & Building B (Student Center)- 100%Design Development Set Construction of Building (A)Administr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Richmond |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Power Generation (CCGT), Waste Processing and Treatment, Residential, Commercial, Power Transmission, Steel, Consumer Products, Education, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
