logo

Kenneth C. Griffin Pavilion at Memorial Sloan Kettering Cancer Center

One of 10,000+ projects Taiyo tracks in New York.

Source: The Real Deal

Project
Planned

A 730,000-square-foot cancer center on York Avenue between East 66th and East 67th streets in Manhattan, rising more than 480 feet, featuring 28 operating rooms and more than 200 patient beds, connected to the existing hospital by a two-story skybridge.

Status
Prospective
Sector
Road, Hospital
Location
New York City, New York, United States of America
Updated
22 Jul 2026
Source
The Real Deal

ConstructChat

Ask ConstructChat about Kenneth C. Griffin Pavilion at Memorial Sloan Kettering Cancer Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Kenneth C. Griffin Pavilion at Memorial Sloan Kettering Cancer Center” is an infrastructure initiative in the Road sector, located in New York City, New York, United States. Taiyo aggregates data on it from The Real Deal.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 730,000-square-foot cancer center on York Avenue between East 66th and East 67th streets in Manhattan, rising more than 480 feet, featuring 28 operating rooms and more than 200 patient beds, connected to the existing hospital by a two-story skybridge.

Original sector

Development

Location

Country

United States of America (USA)

State

New York

City

New York City

Source

Source

The Real Deal

URL

More Details

Record type

Project

Sector

Road, Hospital

Article published date

2025-12-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project