Kenosha Sheridan Road Pavement Replacement
Sector: Water Supply and Storage • Location: Kenosha, Wisconsin, United States of America
Source: Dodge USA
Kenosha Sheridan Road Pavement Replacement The State of Wisconsin, Department of Transportation, may be seeking a consultant to provide Consultant services for Rehabilitation project to replace the pavement of approximately 0.97 miles of STH 32 from 75th st to 61st St in the City of Kenosha in Kenosha County. Replace the pavement, gravel base, and subgrade improvement layer. Additional work includ
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Road, Car parking, Waste Processing and Treatment, Manufacturing (Industrial), Automotive
- Location
- Kenosha, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Kenosha Sheridan Road Pavement Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Kenosha Sheridan Road Pavement Replacement The State of Wisconsin, Department of Transportation, may be seeking a consultant to provide Consultant services for Rehabilitation project to replace the pavement of approximately 0.97 miles of STH 32 from 75th st to 61st St in the City of Kenosha in Kenosha County. Replace the pavement, gravel base, and subgrade improvement layer. Additional work includes replacing curb & gutter, sidewalk, ADA curb ramps throughout the corridor, storm sewer, signin... |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Kenosha |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Car parking, Waste Processing and Treatment, Manufacturing (Industrial), Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
