Kensington Credit Union Centre Upgrades
Sector: Solar • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
The project will generally include various upgrades to the Kensington Credit Union Centre (CUC) Rink facility. The CUC is approximately 50 years old and requires upgrades to extend its useful life and to operate more efficiently. The CUC benefits the Town of Kensington and approximately 29 surrounding communities for activities such as hockey, figure skating, a gym facility, hosting town events/fe
- Status
- Closed
- Sector
- Solar, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Road
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Kensington Credit Union Centre Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will generally include various upgrades to the Kensington Credit Union Centre (CUC) Rink facility. The CUC is approximately 50 years old and requires upgrades to extend its useful life and to operate more efficiently. The CUC benefits the Town of Kensington and approximately 29 surrounding communities for activities such as hockey, figure skating, a gym facility, hosting town events/festivals, etc. The project will also improve the safety and comfort for the general public and users of the facility. More specifically the project will include: 1. Installation of a 100kw solar panel system for electricity generation to allow for a more efficient operation and reduce our carbon footprint. 2. Ice Plant Replacement - The current ice plant is in need of immediate replacement, including 2 compressors, a chiller, evaporator and brine pump. 3. Heat Reclamation Tanks - Will allow for the heating of water through residual heat that would otherwise be wasted. 4. LED Lights over Ice Surface - Better and more efficient lighting. 5. Ice Surface Enclosure Boards - Replacement of boards, glass and netting. 6. Ice Jet Water Purification - Provide a better quality, and clearer ice surface. 7. Parking Lot Pavement Re-surfacing - Provide a safer parking area for users. 8. Exterior Painting - Will give the facility a fresh coat of paint. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Road |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Canada
- Menno Simons School Addition and Modernization
- Northern Sunrise County Water Treatment Plant
- Claresholm Solar Project Alberta
- Travers Solar Project Alberta Canada
- Hydro-Québec Centrales solaires Gabrielle-Bodis et Robert-A.-Boyd
- Fundy Trail Development Authority Inc.Fundy trail solar energy conversion
- Mactaquac Provincial Park upgrades
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
