logo

Kent Solar HPPs - Group 1

Sector: Power Generation (CCGT) • Location: Turkey

Source: World Bank Group

Project
Active

In February 2010, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) awarded the concession to operate three mini hydro power plants, known as Group 1 and with total a capacity of 0.984 MW, to Turkish solar power group Kent Solar Elektrik [Turkey]. The minihydro power plants were 0.24 MW Iznik Derekoy, 0.272 MW Ingegol Cerrah and 0.472 MW M Kemalpasa Suuctu, all of t

Status
Prospective
Sector
Power Generation (CCGT), Solar, Hydro, Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kent Solar HPPs - Group 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kent Solar HPPs - Group 1” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In February 2010, the Turkish Privatization Administration (Ozellestirme Idaresi Baskanligi or OIB) awarded the concession to operate three mini hydro power plants, known as Group 1 and with total a capacity of 0.984 MW, to Turkish solar power group Kent Solar Elektrik [Turkey]. The minihydro power plants were 0.24 MW Iznik Derekoy, 0.272 MW Ingegol Cerrah and 0.472 MW M Kemalpasa Suuctu, all of them located in Bursa, Turkey. They were transferred under the Transfer of Operating Rights (TOR) scheme, which made it classified as a BROT Concession in the PPI database. The project was expected to sell electricity produced in the liberalized electricity market in Turkey. Kent Solar Elektrik won Group 1 mini hydro plants by offering US$6.6 million in the public auction after the 22 rounds of bids. Group 1 was one of the 19 groups of small and medium hydro power plants which OIB tendered to private consortia in February 2010. The 19 groups comprised 52 small and medium size hydro power generation plants which were owned by state-owned power firm Elektrik Uretim A.S. (EUAS) and had a total capacity of 141 MW. The 19 groups were auctioned in by competitive bidding attracting 615 bids. In May 2010, the final negotiations were completed in May 2010 for 17 tenders out of 19 in total, except groups 11 and 12. The tenders for these two groups would be held at a further date, as the plants in these groups were located at a disaster area on a historical site. In June 2010, the final negotiation for Group 11 was completed and Group 12 was to be canceled for its tender. The privatization process of most of the 19 groups concluded in 2011. According to the privatization agency, the process was completed on January 25th, 2011, when the shares where transferred to the private sponsor for US$6.6 million

Original sector

Energy

Procurement method

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Hydro, Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project