Kenton and Campbell Counties Preventive Maintenance Project
Sector: Road • Location: Kentucky, United States
Source: NKyTribune
Preventive maintenance project on multiple routes in Kenton and Campbell counties including crack sealing, electrical work, and thin asphalt overlay (thinlay). Paving work complete; rumble strips and thermoplastic striping remain. Locations include Madison Pike (KY 17), Dixie Highway (U.S. 25), and Alexandria Pike (U.S. 27). Completion expected by September 30, 2025.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Preventive maintenance project on multiple routes in Kenton and Campbell counties including crack sealing, electrical work, and thin asphalt overlay (thinlay). Paving work complete; rumble strips and thermoplastic striping remain. Locations include Madison Pike (KY 17), Dixie Highway (U.S. 25), and Alexandria Pike (U.S. 27). Completion expected by September 30, 2025. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
